Time logging is how you record the hours you work on client projects. Every hour logged flows through to invoicing, utilisation reporting, and project profitability. ConsultancyOS Operate gives you three methods, use whichever fits your day.

## Who can use this

| Role          | Access Level                                             |
| ------------- | -------------------------------------------------------- |
| Admin         | Log time for themselves and on behalf of any team member |
| Manager       | Log time for themselves and on behalf of their team      |
| Staff         | Log their own time only                                  |
| Client Portal | Cannot log time                                          |

## When to use this

Log time:

- **During the day**: use the Timer to capture hours as you work
- **End of each day**: use the Daily List to enter what you did today
- **End of the week**: use the Weekly Grid to reconcile your full week

The closer you log to when the work happens, the more accurate your entries are.

## Before you start

Make sure:

- At least one project exists with **Active** status
- You are assigned to the project (or it's visible to your role)
- You know whether the work is **billable** or **non billable**
- The Time & Expenses module is enabled (check sidebar, if missing, ask your admin)

## Quick steps

- **Timer:** Click timer bar > select project > Start > work > Stop
- **Grid:** Time & Expenses > click cell > type hours > Tab to next
- **List:** Time & Expenses > List view > + Add Entry > fill form > Save

## Step by step

### Method 1: The Timer (Real Time Tracking)

Best for: consultants who switch between tasks during the day.

1. Look at the **timer bar** at the top of any page in ConsultancyOS Operate
2. Select a **project** from the dropdown
3. Optionally select a **task** within that project
4. Click **Start**
5. The timer counts up in real time, it persists as you navigate between pages
6. When you're done, click **Stop**
7. The system calculates your hours, applies rounding (if configured), and creates a Draft entry
8. Add a **description** if required by your organisation's settings

**One timer everywhere:** the timer bar at the top of the page, the timer bar on the Time & Expenses grid, favourite project chips, and My Work all drive the **same timer**. Wherever you start or stop it, every surface shows the same project and elapsed time.

**Stopping and resuming:** click **Resume** in the timer bar, press **C**, or click **▶** on today's entry, and the timer continues that same entry. The new time is added to it, so you don't get a duplicate row. See Start, Stop and Resume the Timer.

**Timer collision:** What happens when you start a new timer (or switch the running timer's project) while one is already running depends on your organisation's **Timer Collision** setting (Settings → Time):

- **Auto Stop** (default): the previous timer stops automatically, saves your hours, and the new one starts.
- **Prompt** / **Block**, the new timer is refused with "A timer is already running. Stop it first." so an existing timer can't be lost by accident. Stop the running timer first, then start the new one.

### Method 2: Weekly Grid (Batch Entry)

Best for: end of week reconciliation and people who work on the same projects each week.

1. Go to **Time & Expenses** in the sidebar
2. You'll see a grid: **projects as rows**, **days as columns** (Mon to Sun)
3. Click any **cell** to enter hours for that project on that day
4. Type the number of hours (e.g. `4` or `2.5`)
5. Press **Tab** to move to the next cell, or **Enter** to save
6. Hours are saved as Draft entries immediately

**What the grid shows:**

- **Column totals** at the bottom, your total hours per day
- **Row totals** on the right, your total hours per project for the week
- **Progress bar** at the top, hours logged vs your contracted target (e.g. 32/40h)
- **Status colours**: cells are tinted by status: no colour (Draft), blue (Submitted), green (Approved), red (Rejected)

**Copy Last Week:** Click this button to duplicate the previous week's project rows (without hours). Saves time if you work on the same projects week after week.

### Method 3: Daily List (Detailed Entry)

Best for: people who want to add descriptions, link tasks, and see a full day breakdown.

1. Go to **Time & Expenses** and click the **List** toggle (top right)
2. Click **+ Add Entry**
3. Fill in:

| Field       | Required | Description                                                                                    |
| ----------- | -------- | ---------------------------------------------------------------------------------------------- |
| Project     | Yes      | Which project you worked on                                                                    |
| Task        | No       | Specific task within the project (helps with reporting)                                        |
| Date        | Yes      | Defaults to today, change if logging retrospectively                                           |
| Hours       | Yes      | Time spent (minimum 0.01, maximum 24)                                                          |
| Description | Depends  | Required for billable T\&M entries if your admin has enabled the "Require Description" setting |
| Billable    | Yes      | Defaults to Yes for billable projects, No for Non Billable projects                            |

4. Click **Save**

**Collapsing days:** On a busy week, click a day's name (the arrow beside it) to collapse that day to its header. The date, the day's total and the number of entries stay visible, so you can still scan the week. Click again to open it. **Collapse all**, above Monday, closes every day of the week, and **Expand all** opens them again. Clicking **Add** on a collapsed day opens it. Your choices are remembered in this browser. After **Collapse all**, other weeks open collapsed too, except today, which always opens expanded.

## What happens next

After logging time:

1. Your entry is saved as **Draft**, you can still edit or delete it
2. The project's **budget consumed %** updates in real time
3. Your **utilisation** metrics update on your personal dashboard
4. The entry appears on the **Weekly Grid** and **Daily List** simultaneously
5. When you're ready, **Submit Week** to send entries for approval

After submission:

- Entries move to **Submitted** status (locked for editing)
- Your manager receives a notification
- Once **Approved**, entries become available for invoicing
- The **billing rate** is locked at approval time, rate changes after approval don't affect existing entries

## Good practice

- **Log time the same day**: don't wait until Friday. Details fade quickly.
- **Use descriptions on billable entries**: clients see these on invoices. Write "Discovery workshop with marketing team" not "meeting".
- **Pin your top 3 projects as Favourites**: they appear at the top of the time page for one click timer start.
- **Let the reminders catch you**: if you consistently forget, ask your admin to switch on Timesheet Reminders (a weekly reminder, plus an optional daily "no time logged yesterday" nudge, in the bell and by email).
- **Use the progress bar**: if it's Thursday and you're at 20/40 hours, you know you have catching up to do.
- **Don't round manually**: enter the exact time (`2:52` or `2h52m` works as well as `2.87`). Operate keeps that exact figure and applies your organisation's rounding where its Time Rounding setting says, see Time Rounding.

## Things to know

> **Retroactive entry limits:**
>
> Your admin can restrict how far back you can log time (default: 90 days). If you try to enter time for a date older than the limit, you'll see an error.

> **Future dates blocked by default:**
>
> You cannot log time for future dates unless your admin has explicitly enabled this in Settings. "Future" means future in **your own time zone**, not the server's. Today's date is always loggable wherever you are, including in the early morning when much of the world is still on yesterday's date.

> **Submitted entries are locked:**
>
> Once you click Submit Week, you cannot edit those entries. If you spot an error, ask your manager to reject the entry so you can re edit it.

> **Non Billable projects:**
>
> Projects with the Non Billable billing model automatically set all time entries to non billable. You cannot override this per entry.

> **Billing rate is resolved automatically:**
>
> Your billing rate is looked up from a 6 level hierarchy: Project (user specific) → Project (role based) → Client (user specific) → Client (role based) → Global (user specific) → Global (role based). If no rate is found, the entry has a $0 rate. Contact your admin to set up rates.

## Troubleshooting

| Problem                               | Cause                                                    | Solution                                                                                                                                                                                                                            |
| ------------------------------------- | -------------------------------------------------------- | ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| Project not in dropdown               | Project is Draft or Completed                            | Ask your admin to set the project to Active                                                                                                                                                                                         |
| "Cannot log time for this date"       | Date is outside the retroactive window                   | Contact your admin to extend how far back time can be logged (Settings, Time)                                                                                                                                                       |
| Timer won't start                     | Another timer is already running                         | Stop the current timer first, or it will auto stop when you start a new one                                                                                                                                                         |
| Hours show as 0.25 when I entered 0.1 | Your org rounds each entry when it's saved (the default) | By design, the exact figure is kept too, and the entry notes "tracked 6m". If your timesheet must match a source tracker, ask an admin to switch Time Rounding to "Keep exact time; round for billing and reports" (Time Rounding). |
| Can't edit a time entry               | Entry has been submitted or approved                     | Ask your manager to reject it so it returns to Draft                                                                                                                                                                                |
| No billable amount showing            | No billing rate configured                               | Contact your admin to set up rates in Settings > Rates                                                                                                                                                                              |
| "Description required" error          | Your org requires descriptions on billable T\&M entries  | Add a description explaining what you worked on                                                                                                                                                                                     |
| Entry not appearing on project        | Wrong project selected                                   | Edit the entry and change the project                                                                                                                                                                                               |

## Related guides

- [Submitting Timesheets](/docs/time/submitting), how to submit your week for approval
- Recurring Time Entries, set up time that repeats on a schedule so it lands on your timesheet without re keying
- Time Rounding, how your organisation's rounding increment applies, and keeping timesheets exact
- Keyboard Shortcuts, speed up time entry with shortcuts
- Calendar View of Your Time, see your time by day across a month or week, spot gaps, and add or edit entries from the calendar
- Log Time From a Sentence and Expenses From a Receipt, type "2 hours today on design" and get a draft entry to confirm
- [Expenses](/docs/time/expenses), log business expenses alongside time
- Exporting Time & Expenses, download your entries as CSV or Excel
- Creating Projects, set up projects to log time against
- Generating Invoices, how approved time becomes an invoice

## Common questions

**Can I log time for someone else?**

Admins and Managers can log time on behalf of other team members. Staff can only log their own time.

**What happens if I log time but don't submit?**

Draft entries sit indefinitely. They are not visible to your manager for approval and cannot be invoiced. Submit weekly to keep the billing cycle moving.

**How does time rounding work?**

Your admin configures an increment (6, 10, 15, 30, or 60 minutes), a direction (Up, Down, or Nearest) and where it applies. For example, with 15 minute rounding Up, 1.1 hours bills as 1.25 hours. By default every entry is rounded when it's saved; your organisation can instead keep the exact time on timesheets and round only for billing and reports, or not round at all. The exact time is always kept. See Time Rounding.

**Can I log time to a task?**

Yes, when creating a time entry, select both the project and the task. This gives you granular reporting on where hours are spent within a project. Task assignment is optional.

**What's the difference between billable and non billable?**

Billable hours are charged to the client at your billing rate and appear on invoices. Non billable hours are tracked for utilisation and project cost analysis but not invoiced.

## Next steps

Now that you've logged time:

1. **Submit your timesheet** → [Submitting Timesheets](/docs/time/submitting)
2. **Log an expense** → [Expenses](/docs/time/expenses)
3. **Check your utilisation** → My Dashboard
4. **Review your week** → Time & Expenses > use \[ and ] keys to navigate weeks

---

For a semantic overview of all documentation, see [/sitemap.md](/sitemap.md)

For an index of all available documentation, see [/llms.txt](/llms.txt)

For agent-facing discovery, including API and MCP surfaces, see [/agents.md](/agents.md)