---
title: Set up a retainer
description: Turn a project on the Retainer billing model into a monthly allocation of hours, with rollover and overage.
url: "https://docs.consultancyos.ai/docs/retainers/set-up"
docs_index: /llms.txt
lastUpdated: 2026-11-27
---

> For an index of all documentation, see [/llms.txt](/llms.txt).

Set up a retainer once for each Retainer project. From then on, time logged on the project draws down each period's hours, and the card tells you what's used, what's left and what's ready to bill.

## Who can use this

| Role          | Access Level                                     |
| ------------- | ------------------------------------------------ |
| Admin         | Create, edit, record hours and delete            |
| Manager       | Create, edit and record hours                    |
| Staff         | Not visible. Staff just log time to the project. |
| Client Portal | Not visible                                      |

## Before you start

The project's billing model must be **Retainer**. Set it when you create the project, or change it in the project's details. A Retainer project without a retainer shows a **Set up the retainer** card on its Overview, which opens the same form.

## Step 1: Create the retainer

1. Go to **Finance > Retainers** and click **New retainer**.
2. Choose the **Project**. Only Retainer projects without a retainer are listed.
3. Enter the **Monthly hours** and the **Billing rate**.
4. Choose the **Period cadence**: Monthly, Weekly or Quarterly. It can't be changed later.
5. Choose the **Rollover policy**:
   - **Expire**: unused hours are lost at the end of the period.
   - **Carry forward**: unused hours move into the next period, up to the **Rollover cap** if you set one.
6. Choose **Overage handling**, for hours beyond the allocation:
   - **Auto-invoice at multiplier**: billed at the rate times the **Overage multiplier** (1.25 by default).
   - **Auto-invoice at standard rate**: billed at the plain retainer rate.
   - **Absorb (don't charge)**: shown on the invoice at no charge, so the client sees the work.
7. Click **Create retainer**. The first period starts in the current month.

## Step 2: Let time draw it down

Nothing else to do. Every billable hour logged on the project, draft, submitted or approved, counts against the period it was logged in, as soon as it's logged. Rejected and non billable time doesn't count.

## Step 3: Watch the current period

| Figure          | Meaning                                                                                                            |
| --------------- | ------------------------------------------------------------------------------------------------------------------ |
| **Allocated**   | This period's hours plus any carried in                                                                            |
| **Used**        | Hours logged in the period, plus any recorded by hand. The line underneath splits approved from awaiting approval. |
| **Remaining**   | Allocated less used                                                                                                |
| **Rolled over** | Hours carried in from the last period                                                                              |

The bar turns amber at 85% and red when the period is over. An **Over by** badge shows the excess and what it will cost the client.

**Ready to invoice** shows the approved hours no invoice has billed yet, split into the retainer line and any overage line, exactly as the invoice will bill them. **Generate invoice** opens Billing with the project chosen.

## Generate the next period

At the start of each month, click **Generate next period** on the card. It applies your rollover policy to the last period's actual use. Time logged after the last period ends is flagged on the card until you do.

## Record hours used

For work that isn't logged in Operate, enter the period's total in **Record hours used** and click **Save**. Logged time is already counted, so only the difference is stored.

## Good practice

- **Check retainers mid month.** If a client is heading over, talk to them before the hours run out, not after.
- **Watch Avg utilisation.** Consistently over 100% means it's time to resize the retainer.
- **Generate the next period on the first working day** of each month.
- **Approve time weekly**, so Ready to invoice is complete at month end.

## Troubleshooting

| Problem                             | Cause                                                                 | Solution                                                       |
| ----------------------------------- | --------------------------------------------------------------------- | -------------------------------------------------------------- |
| New retainer is greyed out          | Every Retainer project already has one                                | Set another project's billing model to Retainer                |
| The project isn't in the list       | It isn't on the Retainer billing model                                | Change its billing model                                       |
| Hours aren't drawing down           | The time is non billable, rejected, or logged before the first period | Check the time entries; the card notes time outside any period |
| Ready to invoice is lower than Used | Some time isn't approved yet                                          | Approve the timesheets                                         |

## Related guides

- [Generate an invoice](/docs/billing/invoices)
- [Submit and approve timesheets](/docs/time/submitting)
- [Create a project](/docs/projects/creating), including the billing model

---

For a semantic overview of all documentation, see [/sitemap.md](/sitemap.md)

For an index of all available documentation, see [/llms.txt](/llms.txt)

For agent-facing discovery, including API and MCP surfaces, see [/agents.md](/agents.md)